The Student Center for Saint Anthony’s High School is a multi-level, 145,000 square foot Athletic and Arts facility. The building is a pre-engineered steel structure with masonry, insulated metal panel, translucent panel and glass curtain wall as the façade. The overall footprint of the facility is approximately 320 ft. long by 220 ft. wide with a ceiling height of 30 ft.
Custom features and accommodations of the building include a state of the art track and field facility, permanent grandstands, 3 practice basketball courts, multiple locker rooms, a Wrestling Room, Choral Rehearsal room, Band Rehearsal room, Dance Studio and multiple Multi-purpose Rooms. The lower level features a sophisticated waffle slab concrete ceiling to accommodate the significant load from the facilities above. The Student Center is connected to the school by a common corridor and has a tunnel that provides a dramatic entrance to the outdoor playing fields from the locker rooms on the lower level.
The facility replaces the schools existing locker rooms, and provides additional student features including a Concession Facility, Team Store, Athletic Therapy and Treatment accommodations, additional bathrooms, and storage.
Construction was completed for January of 2009, under the client's budget.
Project Size: 145,000 Square Feet Location: Huntington, NY Owner: Saint Anthony's High School Architect: Baldassano Architecture
|
 |
|